Temperature sensor protection well, general types
MN531 Protection well
Key features
- Material : AISI316
- Maximum pressure : 100 bar / 20 °C
- Weight : 170 g (MN531-100B12)
- Available in a wide range of threads
MN2380 Protection well
Key features
- Material : SS2343-AISI316
- Available in several lengths
- Available in several threads
- Measurements drawing MN2380
MN2651 Protection well
Key features
- Material : AISI316
- Weight : 165 g (MN2651-30B12)
- Maximum pressure : 350 bar
- Available in several lengths
- Available in several threads
MN3050 Protection well
Key features
- Material : AISI316
- Available in several lengths
- Available in several threads
- Measurements drawing MN3050
MN3165 Protection well
Key features
- Material : AISI316
- Maximum pressure : 350 bar
- Available in several lengths
- Available in several threads
- Measurements drawing MN3165
MN3215 Protection well
Key features
- Material : AISI316
- Length : 400 mm
- Available in several threads
- Measurements drawing MN3215
MN3324 Protection well
For general purpose.
Key features
- Material : AISI316
- Maximum pressure : 250 bar
- Length : 63 mm
- Available in several threads
- Measurements drawing MN3324
MN3349 Protection well
Key features
- Material : AISI316
- Length : 60 mm
- Threads : ISO228-G3/8
- Measurements drawing MN3349
MN3538 Protection well
Key features
- Material : AISI316
- Thread : ISO228-G1/2
- Maximum pressure: 350 bar
- Available in several lengths
- Measurements drawing MN3538
MN3634 Protection well
Key features
- Material : AISI316
- Maximum pressure : 350 bar
- Available in several lengths
- Available in several threads
- Measurements drawing MN3634
MN3795 Protection well
Key features
- Material : CuNi70/30
- Available in several lengths
- Available in several threads
- Measurements drawing MN3795
Tjenester og support
-
24/7 Technical support
Our 24/7 technical support team is there to help at any time, day or night, wherever your vessel is.
-
Conversions, retrofit and refit
We understand the importance of having the right parts, available in the right place, at the right time.
-
Training
Ensure that your crew is properly and thoroughly trained. This will reduce operational risk, downtime and maximise return on asset investment.