K-Bridge - Integrated Bridge System
- Adaptable to all sea-going ship and vessel types
- Designed to meet all IMO and classification societies’ requirements
- More than 50% of the world’s navigators are trained on our bridge simulators
The benefits of our Integrated Bridge Systems:
- One man control
- Rational route planning
- Automatic route-keeping functions
- Fail-to-safe mode of operation
- Functionality and reliability
Easy operation
Our Integrated Bridge System is designed for easy operation to allow maximum time for observation and decision making. This is particularly apparent in our ARPA/radar and ECDIS systems. These systems have the same intuitive user interface, the same panel layout and menu system. Route plans, mariner's notes, charts, radar video and vector presentation are shared between the systems.
"Turn-key" integrated bridge system
Our integrated bridge system is supplied as a "turn-key" delivery. To simplify installation onboard, all systems are pre-installed in their consoles on delivery. Cable connections are wired to easily accessible terminals for quick cable connection onboard. Compliance with relevant rules and regulation are checked before the equipment is installed, thereby avoiding possible expensive redesign on site.
Benefits of integration
- Palettes are changed simultaneously on all K-Bridge operator stations
- The active route (the monitored route) is displayed on all K-Bridge stations when selected on one
- Chart maintenance from one station and mirrored to the others
- One set of own ship information
- Track information on conning display - no external interface
- Radar/ARPA target information available on ECDIS - no external interface
- Radar/ARPA radar video available on ECDIS - no external interface
- Radar/ARPA radar video recorded by VDR via LAN - no external interface
Servicios y soporte
-
24/7 Technical support
Our 24/7 technical support team is there to help at any time, day or night, wherever your vessel is.
-
Conversions, retrofit and refit
We understand the importance of having the right parts, available in the right place, at the right time.
-
Training
Ensure that your crew is properly and thoroughly trained. This will reduce operational risk, downtime and maximise return on asset investment.